Connolly Scaffolding has been commissioned to provide scaffolding for the interior redevelopment of swimming baths, in Stockport.
Grand Central Leisure is a busy local hub with a gym, pool and reception area that are in use during refurbishment and so needed to be kept clean and separate.
The unique design of the building, meant that the scaffolding had to be set over multiple levels of sloping floor. The tube and clip scaffolding used on this project, allowed for greater flexibility, ensuring accurate levelling and safety.
The Connolly Scaffolding team, carefully planned the most efficient use of space for the works, whilst ensuring there was no damage to structure or fittings.